| DFIRSTTM CO-ORDINATION CHECKLIST - TX | ||||||||
| PRIOR TO EXERCISE | ||||||||
| ACTION/EVENT | UNIT | UNIT's HIGHER HQ | DFIRST MSM | REMARKS | ||||
| Identify & schedule Annual Training DFIRST requirements. | X | During AT sceduling conference. | ||||||
| Identify & schedule IDT DFIRST requirements. | X | 30 - 60 days in advance. | ||||||
| Identify general Area of Operations (AO) and general concept of training. Identify special requirements. | X | At time of scheduling. | ||||||
| Coordinate movement of base station thru DOL. | X | X | 30 - 60days in advance. | |||||
| For Remote DFIRST usage (i.e. Camp Swift) | ||||||||
| Provide information briefing, conduct coordination visit to unit trainers and participants. | X | As required. | ||||||
| Provide OPLAN with overlay. | X | X | 5 days before STARTEX. (Provided to the Operators during operator course is optimal.) | |||||
| DFIRST operators/installers attend 16 hour course. | X | Number of operators/installers and training time are variable based upon mission and equipment. | ||||||
| Conduct DFIRST operator training. | X | |||||||
| Perform map and ground coverage surveys of AO. | X | |||||||
| Identify communications requirements: Hardware and SOI. | X | X | ||||||
| Set up base station and relay. | X | X | MSM with operator assistance. | |||||
| Install DFIRST instrumentation. | X | X | Vehicle crews assisted by operator/installers and supervised by MSM. | |||||
| Provide & pre-position generator at site. 30 KW for base Station at remote site if no Hard Wired Power Source. | X | 24 hours before STARTEX and operationally pre-checked. | ||||||
| Provide & Maintain Honda Type Generator for Relay Site | X | |||||||
| Provide Suitable Maps for use in DFIRST system for remote | X | 30 - 60 Days in Advance | ||||||
| Training Locations as Required | ||||||||
| DURING EXERCISE | ||||||||
| ACTION/EVENT | UNIT | UNIT's HIGHER HQ | DFIRST MSM | REMARKS | ||||
| Operate DFIRST base station and tactical communications. | X | Operator. DMSM assisted. Operator knows unit training objectives and OPLAN. | ||||||
| Conduct After Action Reviews (AARs.) | X | O/C conducted, MSM assisted. | ||||||
| Maintain generator fuel site IAW training site SOP. | X | |||||||
| Daily fuel and PMCS generators. | X | |||||||
| Troubleshoot and keep system operational. | X | |||||||
| Recover communication equipment. | X | Operator, MSM assisted. | ||||||
| Recover generator and fuel point materials. | X | Operator, MSM assisted. | ||||||
| Un-install, clean, inventory & turn in DFIRST instrumentation. | X | X | Bldg 27 or Location TBD | |||||
| Recover relay trailer. | X | X | ||||||
| Prepare base station for movement to Remote Training Site. | X | Operator and MSM. | ||||||
| Recover base station From Remote Training Site. | X | Coordinate with DOL. | ||||||
| Identify Access Pass requirements for training areas / Ranges | X | |||||||
| Coordinate Access to Training Areas for Pers & Equip | X | X | ||||||
| Identify & request additional Equipment as required | X | X | ||||||
| Identify & request mission support funding for MSM | X | X | ||||||
| Provide Take Home Package. | X | ENDEX. | ||||||